Pool paver / coping / tiling

Image
Lots of work over the last few weeks. The pool pavers and coping (Atlantic Grey Marble) has been installed. Work has also started on the tiling. Very close to being finished.   

Pool shell, filter, pump, and heater installed.

Image
Been a busy time of late with plenty happening in the backyard.The pool shell has been poured, along with the pool filter, pump, and heater installed.

Pool ready for concreting

Image
Steel and plumbing complete. Ready for concrete next Tuesday 2/4/2024.   

Lots happening - Pool excavation and moving in 15/3/2024

Image
Big push yesterday in prep for the moving truck to move all the big pieces of furniture. They did a great job and didnt damage any of our stuff or any walls in the new house.  The pool excavation was going great until we hit an old septic tank. Had to arrange for a separate skip to dispose of it. After that is was smooth sailing and the dig is now complete.   

Keys Keys Keys!!!!!

Image
Big Day today. I'll post some pics of the completed house shortly.  

Retaining Wall Bagging complete 15/2/2024

Image
Big job ticked off the list. The backyard is now ready for the pool contractor. 

Retaining Wall 5/2/2024 - 8/2/2024

Image
With the services pipe issue solved early this morning, the guys smashed it out in the heat today. Starter bars, trench mesh, and the pour of the footings. The placement of the wall will net us around another 27sqm of land. Worth the effort and the expense.

Retaining wall - Phase 2 - 3/2/2024

Image
Onto the next part - Phase 2 of the Retaining Wall. This will create the platform and support the digging of the pool. Got a few servcies (storm water and sewer) to take care of which wont be too hard. Footings down by Tuesday, blocks in by Thursday, and core filled by Friday.

PC walkthru, Occupancy Certificate, and Handover Date

Image
Hot off the press this morning we recevied the Occupancy Certificate. The Practical Completion Walkthru was also condcuted today where we identified all the defects and imperfections. The Builder has floated a handover date of 13-14 Feb.

The final touches

Image
The Staircase has had its final coat. All the paint touch ups has been addressed along with the under stairs bit. The front door is looking killer, and the bits and bobs on the alfresco balustrade are complete. Practical Completion Walkthrough booked for Friday 2/2/2024.

Temp Fencing removed and Practical Completion Walkthough booked

Image
Temp Fencing removed and Practical Completion Walkthough booked for 2nd Feb.

Solar System Install - 18/1/2024

Image
Solar system install completed. 11.44kw (26 x 440W panels). Will need to wait until the NBN is connected so I can do the Enphase App setup but the system is active and producing now.

Blinds and curtains (Part 1 of 2) 10/1/2024

Image
Part 1 of Window coverings installed today. Went with a mix of single and double roller blinds combining a sunscreen and a blockout. Very happy with the result. Some of the blinds are motorised via a solar strip / battery motor. Part 2 is the Floor to Ceiling sheer curtain across the downstairs living area and the Plantation Shutters. Both needed to be measured after the flooring was installed.  

Driveway and footpath concreting 8/1/2024

Image
Our builder is back on deck today completing the last bit of the driveway and footpath concreting. We are about 2 weeks away from handover.

Driveway and Sidepath Concreting 21/12/2023

Image
Last update for the year. We got soo close to being done and in by Christmas, but in the end it wasn’t to be. Happy the side path got done and the driveway. The crossover and the council footpath will be done after new years.