Lots of work over the last few weeks. The pool pavers and coping (Atlantic Grey Marble) has been installed. Work has also started on the tiling. Very close to being finished.
Big push yesterday in prep for the moving truck to move all the big pieces of furniture. They did a great job and didnt damage any of our stuff or any walls in the new house. The pool excavation was going great until we hit an old septic tank. Had to arrange for a separate skip to dispose of it. After that is was smooth sailing and the dig is now complete.
With the services pipe issue solved early this morning, the guys smashed it out in the heat today. Starter bars, trench mesh, and the pour of the footings. The placement of the wall will net us around another 27sqm of land. Worth the effort and the expense.
Onto the next part - Phase 2 of the Retaining Wall. This will create the platform and support the digging of the pool. Got a few servcies (storm water and sewer) to take care of which wont be too hard. Footings down by Tuesday, blocks in by Thursday, and core filled by Friday.
Hot off the press this morning we recevied the Occupancy Certificate. The Practical Completion Walkthru was also condcuted today where we identified all the defects and imperfections. The Builder has floated a handover date of 13-14 Feb.
The Staircase has had its final coat. All the paint touch ups has been addressed along with the under stairs bit. The front door is looking killer, and the bits and bobs on the alfresco balustrade are complete. Practical Completion Walkthrough booked for Friday 2/2/2024.
Solar system install completed. 11.44kw (26 x 440W panels). Will need to wait until the NBN is connected so I can do the Enphase App setup but the system is active and producing now.
Part 1 of Window coverings installed today. Went with a mix of single and double roller blinds combining a sunscreen and a blockout. Very happy with the result. Some of the blinds are motorised via a solar strip / battery motor. Part 2 is the Floor to Ceiling sheer curtain across the downstairs living area and the Plantation Shutters. Both needed to be measured after the flooring was installed.
Last update for the year. We got soo close to being done and in by Christmas, but in the end it wasn’t to be. Happy the side path got done and the driveway. The crossover and the council footpath will be done after new years.