Lots of work over the last few weeks. The pool pavers and coping (Atlantic Grey Marble) has been installed. Work has also started on the tiling. Very close to being finished.
Hi Everyone. I've created this blog to track the journey of our latest build. We are embarking upon a custom build after searching far and wide for "the perfect" block. Our search lead us to a 1,062 Sqm property where the primary residence had already been demolished and there was an existing 6 year old granny flat built on the rear portion of the block. Sloping down from the street with views across the valley to the Southwest taking in Berrilee and distant view to the Blue Mountains. We inspected the property and made an offer. After some negotiations, an exchange of contracts occurred and we settled on the property on 3/5/2021. The next phase of the journey will be selecting a builder and designing our home to suit the slope and to take advantage of the views. Stay tuned!
Received revised plans yesterday 27/7/2021 We are getting close to the final plans A few things to tweak - 1. Study to be made larger to better use the wasted space in the entry 2. Media / Theater to be reconfigured - TV to be placed on the external wall. Dual Swing doors to be replaced with Solid Core Cavity Doors. 3. Master WIR to be made larger (Wall indent to be flipped out) making the WIR square. WIR will then be large enough to split into a His and Hers WIR. Delete WIR Door and replace with Square set opening.
Comments
Post a Comment