Sub Floor - progress pics of install. 29/5/2023 Get link Facebook Twitter Pinterest Email Other Apps May 29, 2023 Feeling more and more like a house everyday. Read more
Sub Flooring and second level frames - Ready to go! Get link Facebook Twitter Pinterest Email Other Apps May 27, 2023 Scaffolding completed during the week and the sub flooring is ready for install. Carpenters primed and ready to roll on Monday, 29/5 to stand and fix-off the second level. Read more
2nd Level Scaffolding 19/5/2023 Get link Facebook Twitter Pinterest Email Other Apps May 19, 2023 Moving right along the 2nd Level Scaffolding has commenced. Read more
Lower Level Bricks completed 12/5/2023 Get link Facebook Twitter Pinterest Email Other Apps May 12, 2023 Lower level brickwork wrapped up today. Next phase is subfloors, upstairs framing and roof trusses. Read more
Day 3 of Bricks 10/5/2023 Get link Facebook Twitter Pinterest Email Other Apps May 11, 2023 The Bricklayers are powering along Read more
Lower Level Framing completed and Windows installed 4/5/2023 Get link Facebook Twitter Pinterest Email Other Apps May 04, 2023 Progressing along, the lower level framing has been completed and windows installed. The Bricklayer is starting tomorrow. Read more