Posts

Showing posts from December, 2022

Drainage and Frame - January 2023

Image
The Christmas / New Year shutdown period is upon us. Our Site Supervisor (Frank) has advised the drainage system around the slab will be completed around the 14-16 Jan 2023,  and the Frame is scheduled to be delivered to site on the 23rd of Jan. Merry Christmas everyone!