Gyprock Delivery - Home Theater pre-wire - Solar System pre-wire, and a last minute GPO, 30/8/2023
Lots happening today.
Milestone item - The Gyprock is being delivered. I'm grateful the weather is doing its part as well. The last of the insulation is being installed today along with the pre-wire of the Solar system. Last but not least, I had a last minute GPO added.
Comments
Post a Comment