Electrical rough-in, eaves, kitchen bulkhead, stacker door, gyprock prep, 24/8/2023
Electrical rough-in started today. All the eaves are now completed, the kitchen bulkhead is taking shape, the stacker door is now in spot, and preparations have been made to get the gyprock up to the top floor.
Comments
Post a Comment