Framing has commenced 24/04/2023

Its been a long time coming but today the framing commenced. The plan is to complete all the lower floor framing and lift the steel into place, then shift onto the brickwork for the lower level. Once that's complete, then the flooring and the Upper Level framing and roof trusses will be installed.









    