New Access Point 31/3/2023

Finally some movement on the block. The new access point has been completed. This will allow for the frames to be moved onto the slab via Telehandler.  


The Access Point is so the frames can be moved from the truck to the slab due to the configuration of the overhead power lines preventing the frames being lifted with a crane.



Comments

Popular posts from this blog

Builder # 2 Sketches / Layout / External and Internal Views

Starting Over

Plans 2.0