First Pass at the design

Here is the First Pass at the design. We had a follow up meeting with the Builders Architect 7/7/21, and made some changes to both levels. We also added a bit more cash into the budget to get what we want.

Items we are changing

Ground Floor

    Built in Desk is being removed and Butler's Pantry made larger.

    Garage is being increased in depth by 2 m

    BIR's being added to the ground floor Bedroom and its being slightly enlarged 

    4m high ceiling added to Living, and Dining areas

First Floor

Master bedroom is being reconfigured for his and hers WIR's

Bedroom at the front is being enlarged and the BIR is being halved and a built in desk incorporated.











   

 