Plans 2.0

Image
Received revised plans yesterday 27/7/2021 We are getting close to the final plans A few things to tweak -  1. Study to be made larger to better use the wasted space in the entry 2. Media / Theater to be reconfigured - TV to be placed on the external wall. Dual Swing doors to be replaced with Solid Core Cavity Doors. 3. Master WIR to be made larger (Wall indent to be flipped out) making the WIR square. WIR will then be large enough to split into a His and Hers WIR. Delete WIR Door and replace with Square set opening.      

First Pass at the design

Image
Here is the First Pass at the design. We had a follow up meeting with the Builders Architect 7/7/21, and made some changes to both levels. We also added a bit more cash into the budget to get what we want. Items we are changing Ground Floor      Built in Desk is being removed and Butler's Pantry made larger.      Garage is being increased in depth by 2 m      BIR's being added to the ground floor Bedroom and its being slightly enlarged       4m high ceiling added to Living, and Dining areas First Floor Master bedroom is being reconfigured for his and hers WIR's Bedroom at the front is being enlarged and the BIR is being halved and a built in desk incorporated.