Bricks Delivered 28/4/2023
The first lot of bricks have been delivered. The wire finish red brick is for the front façade which will be rendered. The Whitsunday Brampton is the face brick we selected. The plan is to finish off the lower level frame and then pivot to laying the bricks up to the top plate of the frame. Then pivot back to the upper level frame and then finish off the bricks and weatherboard paneling to produce that Hamptons look façade.