Roof Trusses delivered today, 9/6/2023. The rear landing and steps are also being prepped. The Bricklayers will be finished by tomorrow (Saturday 10/6/2023) and the roof trusses will be done by Wednesday next week, 14/6/2023.
Have settled on a Solar System for the house. Seeing we will be running a Heat Pump for the Pool and also one for the Hot Water System, I wanted to squeeze as big a system as possible onto the roof. 11.31Kw system that will be "Battery Ready"
2nd Level Frames and Windows completed during the week. Bricklayers are booked to return on Monday 5/6/2023 to finish off the bricks. Trusses and roof is scheduled to be completed around 23/6/2023. Solar system will then be installed.